Halff is providing comprehensive engineering design services for Kiewit Engineering Group to relocate and adjust City of Fort Worth water and wastewater mains, preventing conflicts with a proposed roadway, drainage and utility design throughout the project area.
Project work focuses on developing detailed plans necessary for the bidding and construction of this fast-paced design build project.
The scope specifically includes the design and relocation of 23,000 lf of conveyance at various locations throughout the city, including:
-
-
- 13,130 lf of 8 to 12-inch water mains
- 1,440 lf of 16 to 42-inch water mains
- 6,030 lf of 8 to 12-inch wastewater mains
- 3,320 lf of 24 to 48-inch wastewater mains
Halff’s engineering expertise integrates the new alignments with the existing and proposed utility network, while minimizing disruptions during construction and allowing access for future maintenance. This project is vital for maintaining the reliability and efficiency of Fort Worth’s water and wastewater systems in alignment with the City’s infrastructure development plans.
Services involved from Halff include engineering design, project coordination, permitting, construction management and prioritized implementation strategy.