SH 302 Widening and Improvements

SH 302 dirt road at dusk
SIZE:

24 miles

Client:

Texas Department of Transportation Odessa District

Halff provided construction engineering and inspection services for the $65.3 million roadway widening and rehabilitation of FM 181 from CR 313 near Kermit, Texas.

This 24-mile project includes the construction of two new outside lanes, new drainage structures, utility coordination, embankment, base, and HMAC and SMAR-F pavement. These improvements are necessary as SH 302 is currently ranked the fifth most dangerous roadway in Texas due to the large amounts of energy sector traffic within the corridor.

paving trucks at SH 302 for widening and improvements
trucks at SH 302
construction workers paving road at SH 302
erecting light poles at SH 302 widening and improvements project
asphalt truck on SH 302
paving trucks at SH 302 for widening and improvements
trucks at SH 302
construction workers paving road at SH 302
erecting light poles at SH 302 widening and improvements project
asphalt truck on SH 302

Halff Services
Involved

  • Construction Services
  • Local Infrastructure
  • Surveying
  • Transportation

Let’s Connect

Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.

Contact Us