SIZE:
2.94 miles
Client:
Texas Department of Transportation
Construction engineering and inspection services were provided for this $41 million project, which widened the bridge over Cedar Creek Lake from two lanes to four.
The 2.94-mile project included the construction of a new two-lane bridge (0.92 miles), sheet pile walls, new storm sewer and drainage structures, embankment, base, and HMAC and CRCP pavement.
Halff Services
Involved
- Construction Services
- Environmental
- SUE/Utility Coordination
- Surveying
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.